Moorebank - Pedestrian bridge pre assembly

At Hard Bakka Rigging, we were proud to contribute our steel rigging expertise to the pre-assembly phase of a pedestrian bridge in Moorebank, NSW. This infrastructure project was designed to enhance pedestrian access and safety in a high-traffic area and required efficient, safe, and precise rigging solutions.

 

The pre-assembly process involved the rigid structural setup of bridge sections prior to on-site installation. Our role included lifting, aligning, and bolting multiple large steel segments, ensuring they met all engineering specifications before being transported and craned into final position. Pre-assembling the bridge allowed for reduced installation time on site, improving safety and minimising disruption to surrounding activity.

 

Our experienced crew operated a combination of mobile cranes, scissor lifts, and precision rigging equipment to complete this task under tight spatial constraints. The site required careful planning to accommodate large steel components, while maintaining safe walkways and access routes for workers and machinery.

 

In this project, coordination with engineering consultants and site managers was critical. Our riggers ensured that load-bearing points, stress distribution, and joint alignments were thoroughly verified prior to final welding and transport. Despite the complexity of the build, the project was delivered on time and without any site incidents, adhering to the strict WHS standards expected on public infrastructure works.

 

This project at Moorebank underscores Hard Bakka Rigging’s capacity to handle complex structural steel pre-assemblies, particularly for government and civil infrastructure projects. From logistics planning to final rigging execution, we bring safety, precision, and reliability to every stage of the process.

 

Project Summary:

  • Location: Moorebank, NSW

  • Project Type: Pedestrian bridge – pre-assembled sections

  • Scope: Rigging, alignment, and joint pre-assembly

  • Equipment: Mobile cranes, EWPs, rigging gear

  • Outcome: Delivered safely, accurately, and on schedule

  •