Strathfield - Strathfield High School Basketball Court Shelter
Location
Strathfield
Project Type
COLA (Covered Outdoor Learning Area)
Client Sector
Education
Duration
3 Weeks
Crew Size
4-5 riggers
Lifting Equipment Used
30T Crane, Diesel Scissor Lifts
Incidents Reported
None
Challenges Met
Stringent site acess protocols, tight schedule
Project Overview Hard Bakka Rigging was engaged to deliver the structural steel erection for aCovered Outdoor Learning Area (COLA) at Strathfield High School, providing students with year-round access to a sheltered basketball court. The structure was designed to meet both functional and architectural standards while ensuring long-term durability and compliance with educational infrastructure guidelines.
Our team of experienced riggers installed the shelter’s steel columns, trusses, and roofing components with precision, completing the build on time and within budget. The project was carried out in anactive school environment, requiring careful planning and stringent safety protocols. All riggers on site held validWorking with Children Checksand underwentdrug testing, ensuring full compliance with Department of Education regulations for working near students.
High Standards of Safety and Compliance Safety and operational control were prioritised throughout the project. Our crew adhered to all WHS procedures and maintained daily toolbox talks. The use of a 30T crane and elevated work platformsallowed for efficient yet safe lifting and positioning of steel components.
Smooth Execution with Zero Incidents Despite the constraints of working within school grounds, including limited access times and noise restrictions, our team delivered the project without any recorded incidents. Coordination with school management ensured that student safety and site cleanliness were maintained throughout.
A Durable, All-Weather Solution for Active Learning The result is a robust and visually clean structure that supports physical education programs and provides protection from the elements—an asset to Strathfield High School’s outdoor learning environment.
Discover how Hard Bakka Rigging steel rigged Strathfield High School’s Basketball court shelter — completed on time and within budget.