Prestons - The first OTR drive through petrol station at Prestons
OTR Drive-Through Petrol Station Construction Support
Hard Bakka Rigging was proud to support the delivery of thefirst-ever OTR drive-through petrol station in Prestons, NSW. This modern service station combines retail convenience with fuel access, featuring an innovative drive-through layout for customer ease and efficiency. Our team was engaged to assist with thestructural steel erection and rigging servicesrequired to bring this project to life.
This project included theinstallation of the fuel canopy structure, support columns, signage brackets, and other prefabricated steel components. Our crew worked closely with builders and engineers to ensure that all structural elements were lifted, aligned, and fixed into position withmaximum safety and precision.
Given the nature of the site—located near a high-traffic area—logistics and timing were critical. Our team coordinated lifts outside peak traffic hoursto minimise disruption and maintain compliance with local safety standards. As part of our process, we submittedSafe Work Method Statements (SWMS)prior to mobilisation and ensured our riggers were fully certified and inducted.
Key Highlights:
Project Type: Retail Fuel Station (Drive-Through)
Scope: Structural steel rigging and canopy installation
Team Members On Site: 3–4
Lifting Equipment: 25T mobile crane and scissor lifts
Duration: 8–10 days
Site Incidents Reported: None
Challenges Met: Tight access and busy intersection, completed on time and with zero incidents
This project reflectsHard Bakka Rigging’s commitment to safety, precision, and modern construction solutions. Our contribution to Prestons’ new OTR station showcases our ability to work on fast-paced, high-visibility commercial developments, aligning with both construction schedules and community needs.
Discover the first OTR drive through petrol station, built by Hard Bakka Rigging! Completed on time and on budget, to client satisfaction