Hold points in steel erection are planned stops in the ITP where work waits until a check is signed off. Here is where they usually sit, who signs them, and what your steel erector should hand you.
Read More
Most of what makes an imported steel install run well is decided before the steel ships. Here’s what to settle early, from shop drawings and paperwork to packing, laydown and the crane plan, with a local crew to erect it.
Read More
Australia’s $6 trillion iron ore discovery could transform global steel supply, stabilise pricing, and fuel major construction and infrastructure growth. Here’s what it means for industry.
Read More
Hard Bakka Rigging was featured by ANCR Magazine for delivering compliance-driven infrastructure steel erection across rail, airport, healthcare, energy, and mission-critical projects throughout NSW.
Read More